Generating your reports from Ledgible Crypto on Vimeo

[Watch on Vimeo](https://vimeo.com/825470950?fl=pl&fe=vl)

The **Exchange Orders** report provides a single CSV file containing a normalized record of all orders and exchange transactions tied to the exchanges you've linked to your Ledgible account.  
The output file may be opened in tools like Microsoft Excel and Google Sheets for review or further data filtering.

# Step-By-Step Instructions

To generate the **Exchange Orders** report, follow these steps:

- From your [**Ledgible Dashboard**](https://app.ledgible.io/accounting) select the **[Reports](https://app.ledgible.io/accounting/reports)** tab.

- On the **Reports** tab, click the **Create Report** button to start your report.

- In the new **Request Report** window that opens, select the button to the left of **Exchange Orders**, then select **Next** on the bottom right to continue.

- Select the **Crypto Source, Assets** and optionally **Dates** for which you would like to run the report. Select the **Create** button on the bottom right to generate your report.

- You will see a message that your report request was submitted successfully. You can now download and access the report at any time. You can delete it from Ledgible with the red Trash icon.

Select the **Close** button on the **Request Report** modal to return to the **Reports** dashboard.
